| Cisco Certified Network Professional: ROUTE |
|
CCNP: ROUTE (Investment of Time: 50 hours) The ROUTE 642-902 exam will certify that the successful candidate has the knowledge and skills necessary to use advanced IP addressing and routing in implementing scalable and secure Cisco ISR routers connected to LANs and WANs. Course Outline: Implement an EIGRP based solution, given a network design and a set of requirements Determine network resources needed for implementing EIGRP in a network | Create an EIGRP implementation plan | Create an EIGRP verification plan | Configure EIGRP routing | Verify an EIGRP solution was implemented properly using show and debug commands | Document the verification results for an EIGRP implementation Implement a multi-area OSPF Network, given a network design and a set of requirements Determine network resources needed for implementing OSPF on a network | Create an OSPF implementation plan | Create an OSPF verification plan | Configure OSPF routing | Verify OSPF solution was implemented properly using show and debug commands | Document the verification results for an OSPF implementation plan Implement an eBGP based solution, given a network design and a set of requirements Determine network resources needed for implementing eBGP on a network | Create an eBGP implementation plan | Create an eBGP verification plan | Configure eBGP routing | Verify eBGP solution was implemented properly using show and debug commands | Document verification results for an eBGP implementation plan Implement an IPv6 based solution, given a network design and a set of requirements Determine network resources needed for implementing IPv6 on a network | Create an IPv6 implementation plan | Create an IPv6 verification plan | Configure IPv6 routing | Configure IPv6 interoperation with IPv4 | Verify IPv6 solution was implemented properly using show and debug commands | Document verification results for an IPv6 implementation plan Implement an IPv4 or IPv6 based redistribution solution, given a network design and a set of requirements Create a redistribution implementation plan based upon the results from a redistribution analysis | Create a redistribution verification plan | Configure a redistribution solution | Verify that a redistribution was implemented | Document results of a redistribution implementation and verification plan | Identify the differences between implementing an IPv4 and IPv6 redistribution solution Implement Layer 3 Path Control Solution Create a Layer 3 path control implementation plan based upon the results of the redistribution analysis | Create a Layer 3 path control verification plan | Configure Layer 3 path control | Verify that a Layer 3 path control was implemented | Document results of a Layer 3 path control implementation and verification plan | Implement basic teleworker and branch services | Describe broadband technologies | Configure basic broadband connections | Describe basic VPN technologies | Configure GRE | Describe branch access technologies |
- Summer Training for Engineering Students
Summer Training for Engineering Students. -
- RED HAT Enterprise Virtualization 3 Training
Network NUTS announces training on RHEV 3.0 -


